Results

All resulting documents can be used for further studies, planning and research purposes. You can search according to year, work package and type of result in order to obtain the desired document. For example, workshop and consultation results, as well as interim results of specific work packages, are all available.

  •   Deliverables
  •   Consultations
  •   Stakeholder Workshops
  • Stakeholder Workshops

    Results of Stakeholder Workshop: Enhanced pan-European Transmission Planning Methodology

    On May 28th and May 29th 2015, the 6th e-Highway2050 workshop took place. The purpose of this workshop was to present and exchange on an enhanced methodology using optimization methods for long-term transmission expansion planning over large systems in the scope of the workpackage 8 of the e-Highway2050 project.


    Workshop Agenda and Presentations

  • Stakeholder Workshops

    Results of Stakeholder Workshop: Cost Benefit Analysis Methodology for the Modular Development Plan of the Pan-European Transmission Network at 2050

    On 20th March 2014, the e-Highway2050 workshop "A pan-European Cost Benefit Analysis methodology for the modular development plan of the pan-European transmission network at 2050" took place in Brussels. Project partners and European stakeholders discussed the cost-benefit methodology proposed by the project for analyzing new investments on the pan-European transmission corridors up to 2050. The workshop's active debate provided valuable input for the finalization of the approach.

    Please find here the workshop Agenda and the presentations.

  • Deliverables

    A comprehensive long term benefit cost assessment for analyzing pan-European transmission highways deployment (by WP6)

    This document is the deliverable D6.1 of the e-Highway2050 project. It has been developed by WP6 (Socio economic profitability) and contains a comprehensive long term benefit cost assessment for analyzing pan-European transmission highways deployment.

    Download PDF

  • Deliverables

    European cluster model of the Pan-European transmission grid (by WP2)

    This document is the deliverable D2.2 of the e-Highway2050 project. It has been developed by WP2 (Developing the Grid architecture options as a function of the retained scenarios) and contains a European cluster model of the Pan-European transmission grid.

    Download PDF

  • Deliverables

    Methodology for environmental and sustainability assessment and results of its application to the assessment of strategic options (by WP4)

    This document is the deliverable D4.2a of the e-Highway2050 project. It has been developed by WP4 (Modular development & operations) and contains a Methodology for environmental and sustainability assessment and results of its application to the assessment of strategic options.

    Download Link

  • Deliverables

    High-level definition of a new methodology for long-term grid planning (by WP 8)

    This document is the deliverable D8.10 of the e-Highway2050 project. It contains the high-level description of the new methodology for long-term grid planning that will be developed by Work Package 8.

    Download PDF