Results

All resulting documents can be used for further studies, planning and research purposes. You can search according to year, work package and type of result in order to obtain the desired document. For example, workshop and consultation results, as well as interim results of specific work packages, are all available.

  •   Deliverables
  •   Consultations
  •   Stakeholder Workshops
  • Deliverables

    Structuring of uncertainties, options and boundary conditions for the implementation of EHS (by WP 1)

    The main purpose of Deliverable D1.2 as final deliverable of Work Package 1 of e-Highway2050 is to summarize the main findings from the different tasks in the work package and present recommendations for the following work in e-Highway2050. This document structures uncertainties/futures, options/strategies and corresponding boundary conditions for the implementation of EHS that were identified in the different tasks of WP1, in particular technological, economical, political, socio- political and environmental uncertainties and options. The reports from the different WP1 Milestones are confidential but can be accessible upon request to the Coordinator.


    Download PDF

  • Stakeholder Workshops

    Results of Stakeholder Workshop on Generation adequacy on the electricity supply-demand-balance in Europe for 2050 on 10th October 2013

    The objective of the second e-Highway2050 stakeholder workshop was to present and exchange on the methodology built to assess the energy mix and load in 2050 at the Pan-European level for each scenario already defined by the project and to discuss the actual first results of quantification.
    For further information on the content please see the presentations of the workshop.

  • Deliverables

    Executive Summary "Setting the Boundary Conditions for 2020 -2050 Grid Planning" (by WP 1)

    Work package 1 (WP1) of the e-Highway2050 project establishes a comprehensive set of Boundary Conditions to inform all participants of the opportunities and limitations that are required to bring about a successful transition from today's solutions to the next generation of infrastructure needed to support an integrated power system with electricity generation driven predominantly by renewable energy sources in 2050.

    Download PDF

  • Deliverables

    Review of useful studies, policies and codes (by WP 1)

    The objective of this document as the first of two deliverables from WP1 is to collect current knowledge and expectations about future developments in Europe, as seen from the TSO side and in other relevant scenario studies. Together with the outputs from the other tasks this report will be a supplement to the final deliverable D1.2 of WP1.

    Download PDF

  • Stakeholder Workshops

    Results of Stakeholder Workshop on Boundary conditions and scenarios identification for the 2050 transmission system on 23rd January 2013.

    The objectives were to define the limits of the study, the so-called ”boundary conditions”, and to define a robust methodology for the identification of energy scenarios. The scenarios will be used all along the project in order to foresee the possible development of the transmission network in Europe.

    For further information on the content please see the workshop programme, the workshop memo and the presentations of the workshop.