During the entire e-Highway2050 project, significant interim and final results of individual work packages, including stakeholder workshops and consultations, will be published under the ‘Results’ section from 2013 to the end of 2015. This section is continuously extended. One overall result is the Modular Development Plan which will present the architectural possibilities of the electricity transmission network in 2050, including, among other information, the assumptions and calculations for electricity generation, demand and transmission technologies until 2050. Moreover, a network planning method will be developed to serve as the basis for all future long-term network planning. After project completion, the ‘body of knowledge’  will present all project results in a target group-specific and interactive format.

e-Highway2050 articles available on the GridInnovation-on-line Knowledge Sharing Platform

GridInnovation-on-lineKnowledge Sharing Platform

Results

All resulting documents can be used for further studies, planning and research purposes. You can search according to year, work package and type of result in order to obtain the desired document. For example, workshop and consultation results, as well as interim results of specific work packages, are all available.

Your browser doesn't support SVG
  •   Deliverables
  •   Consultations
  •   Stakeholder Workshops
  • Deliverables

    D2.4_Contingency Analyses for Candidate grid architectures for 2050

  • Results

    Related Articles - 2050 Scenarios Grid Architecture

    e-Highway 2050: Approach towards a European cluster model

    Read the article

     

    e-Highway 2050 : Methodology for 2050 scenario quantification

    Read the article

     

    e-Highway 2050: Grid reinforcements design for long term transmission planning in Europe

    Read the article

     

    e-Highway 2050: Grid architectures for 2050

    Read the article

  • Deliverables

    e-Highway2050 2050 Country and cluster installed capacities

  • Deliverables

    D2_2: European cluster model of the Pan-European transmission grid 20072015

  • Deliverables

    D 2.3: System simulations analysis and overlay grid development

  • Deliverables

    D 2.3: System simulations analysis and overlay grid development digest

  • Deliverables

    European cluster model of the Pan-European transmission grid (by WP2)

    This document is the deliverable D2.2 of the e-Highway2050 project. It has been developed by WP2 (Developing the Grid architecture options as a function of the retained scenarios) and contains a European cluster model of the Pan-European transmission grid.