Results

During the entire e-Highway2050 project, significant interim and final results of individual work packages, including stakeholder workshops and consultations, will be published under the ‘Results’ section from 2013 to the end of 2015. This section is continuously extended. One overall result is the Modular Development Plan which will present the architectural possibilities of the electricity transmission network in 2050, including, among other information, the assumptions and calculations for electricity generation, demand and transmission technologies until 2050. Moreover, a network planning method will be developed to serve as the basis for all future long-term network planning. After project completion, the ‘body of knowledge’  will present all project results in a target group-specific and interactive format.

e-Highway2050 articles available on the GridInnovation-on-line Knowledge Sharing Platform

GridInnovation-on-lineKnowledge Sharing Platform

Results

All resulting documents can be used for further studies, planning and research purposes. You can search according to year, work package and type of result in order to obtain the desired document. For example, workshop and consultation results, as well as interim results of specific work packages, are all available.

Your browser doesn't support SVG
  •   Deliverables
  •   Consultations
  •   Stakeholder Workshops
  • Deliverables

    D3.2 Technology innovation needs

  • Deliverables

    D3.1 Technology assessment from 2030 to 2050

  • Deliverables

    Impacts of ICT on the pan-European Power System up to the 2050 Time Horizon

  • Deliverables

    Note on power to gas

  • Deliverables

    Report AC OHL

  • Deliverables

    Report Batteries

  • Deliverables

    Report Cables

  • Deliverables

    Report CAES

  • Deliverables

    Report CHP

  • Deliverables

    Report demand technologies selection a

  • Deliverables

    Report demand technologies selection b

  • Deliverables

    Report electric vehicles

  • Deliverables

    Report FACTS

  • Deliverables

    Report Generation

  • Deliverables

    Report Heat Pumps

  • Deliverables

    Report HVDC

  • Deliverables

    Report LED and lighting

  • Deliverables

    Report OHL HVDC

  • Deliverables

    Report protection and control

  • Deliverables

    Report transformers AC breakers

  • Deliverables

    Report wind power

  • Results

    Related Articles - Technologies

    e-Highway 2050: Performance and cost database of a portfolio of power system technologies expected to impact grid architecture studies at 2050

    Read the article


    e-Highway 2050: A methodology to define power technologies expected to impact grid architecture studies at 2050   

    Read the article


    e-Highway 2050: Management of uncertainties and data contextualization in the framework of the technology assessment of power system technologies expected to impact grid architecture studies at 2050   

    Read the article


    e-Highway 2050: a methodology for building future costs of transmission technologies in the framework of the technology assessment of power system technologies expected to impact grid architecture studies at 2050

    Read the article