Results

During the entire e-Highway2050 project, significant interim and final results of individual work packages, including stakeholder workshops and consultations, will be published under the ‘Results’ section from 2013 to the end of 2015. This section is continuously extended. One overall result is the Modular Development Plan which will present the architectural possibilities of the electricity transmission network in 2050, including, among other information, the assumptions and calculations for electricity generation, demand and transmission technologies until 2050. Moreover, a network planning method will be developed to serve as the basis for all future long-term network planning. After project completion, the ‘body of knowledge’  will present all project results in a target group-specific and interactive format.

e-Highway2050 articles available on the GridInnovation-on-line Knowledge Sharing Platform

GridInnovation-on-lineKnowledge Sharing Platform

Results

All resulting documents can be used for further studies, planning and research purposes. You can search according to year, work package and type of result in order to obtain the desired document. For example, workshop and consultation results, as well as interim results of specific work packages, are all available.

Your browser doesn't support SVG
  •   Deliverables
  •   Consultations
  •   Stakeholder Workshops
  • Deliverables

    D2.4_Contingency Analyses for Candidate grid architectures for 2050

  • Deliverables

    D2_2: European cluster model of the Pan-European transmission grid 20072015

  • Deliverables

    D2_1: Data sets of scenarios for 2050 20072015

  • Deliverables

    D 2.3: System simulations analysis and overlay grid development

  • Deliverables

    D 2.3: System simulations analysis and overlay grid development digest

  • Deliverables

    European cluster model of the Pan-European transmission grid (by WP2)

    This document is the deliverable D2.2 of the e-Highway2050 project. It has been developed by WP2 (Developing the Grid architecture options as a function of the retained scenarios) and contains a European cluster model of the Pan-European transmission grid.

    Download PDF

  • Stakeholder Workshops

    Results of Stakeholder Workshop on Generation adequacy on the electricity supply-demand-balance in Europe for 2050 on 10th October 2013

    The objective of the second e-Highway2050 stakeholder workshop was to present and exchange on the methodology built to assess the energy mix and load in 2050 at the Pan-European level for each scenario already defined by the project and to discuss the actual first results of quantification.
    For further information on the content please see the presentations of the workshop.

  • Deliverables

    Executive Summary "Setting the Boundary Conditions for 2020 -2050 Grid Planning" (by WP 1)

    Work package 1 (WP1) of the e-Highway2050 project establishes a comprehensive set of Boundary Conditions to inform all participants of the opportunities and limitations that are required to bring about a successful transition from today's solutions to the next generation of infrastructure needed to support an integrated power system with electricity generation driven predominantly by renewable energy sources in 2050.

    Download PDF