Results

During the entire e-Highway2050 project, significant interim and final results of individual work packages, including stakeholder workshops and consultations, will be published under the ‘Results’ section from 2013 to the end of 2015. This section is continuously extended. One overall result is the Modular Development Plan which will present the architectural possibilities of the electricity transmission network in 2050, including, among other information, the assumptions and calculations for electricity generation, demand and transmission technologies until 2050. Moreover, a network planning method will be developed to serve as the basis for all future long-term network planning. After project completion, the ‘body of knowledge’  will present all project results in a target group-specific and interactive format.

e-Highway2050 articles available on the GridInnovation-on-line Knowledge Sharing Platform

GridInnovation-on-lineKnowledge Sharing Platform

Results

All resulting documents can be used for further studies, planning and research purposes. You can search according to year, work package and type of result in order to obtain the desired document. For example, workshop and consultation results, as well as interim results of specific work packages, are all available.

Your browser doesn't support SVG
  •   Deliverables
  •   Consultations
  •   Stakeholder Workshops
  • Deliverables

    European cluster model of the Pan-European transmission grid (by WP2)

    This document is the deliverable D2.2 of the e-Highway2050 project. It has been developed by WP2 (Developing the Grid architecture options as a function of the retained scenarios) and contains a European cluster model of the Pan-European transmission grid.

    Download PDF

  • Deliverables

    Methodology for environmental and sustainability assessment and results of its application to the assessment of strategic options (by WP4)

    This document is the deliverable D4.2a of the e-Highway2050 project. It has been developed by WP4 (Modular development & operations) and contains a Methodology for environmental and sustainability assessment and results of its application to the assessment of strategic options.

    Download Link

  • Deliverables

    High-level definition of a new methodology for long-term grid planning (by WP 8)

    This document is the deliverable D8.10 of the e-Highway2050 project. It contains the high-level description of the new methodology for long-term grid planning that will be developed by Work Package 8.

    Download PDF

  • Deliverables

    Review of useful studies, policies and codes (by WP 1)

    The objective of this document as the first of two deliverables from WP1 is to collect current knowledge and expectations about future developments in Europe, as seen from the TSO side and in other relevant scenario studies. Together with the outputs from the other tasks this report will be a supplement to the final deliverable D1.2 of WP1.

    Download PDF