Results

During the entire e-Highway2050 project, significant interim and final results of individual work packages, including stakeholder workshops and consultations, will be published under the ‘Results’ section from 2013 to the end of 2015. This section is continuously extended. One overall result is the Modular Development Plan which will present the architectural possibilities of the electricity transmission network in 2050, including, among other information, the assumptions and calculations for electricity generation, demand and transmission technologies until 2050. Moreover, a network planning method will be developed to serve as the basis for all future long-term network planning. After project completion, the ‘body of knowledge’  will present all project results in a target group-specific and interactive format.

e-Highway2050 articles available on the GridInnovation-on-line Knowledge Sharing Platform

GridInnovation-on-lineKnowledge Sharing Platform

Results

All resulting documents can be used for further studies, planning and research purposes. You can search according to year, work package and type of result in order to obtain the desired document. For example, workshop and consultation results, as well as interim results of specific work packages, are all available.

Your browser doesn't support SVG
  •   Deliverables
  •   Consultations
  •   Stakeholder Workshops
  • Deliverables

    D8.6.a_Detailed enhanced methodology for long-term grid planning

  • Deliverables

    D8.6.b_Enhanced methodology for long-term grid planning prototype

  • Deliverables

    D8.7_Recommendations about critical aspects in long-term planning methodologies

  • Deliverables

    D2.4_Contingency Analyses for Candidate grid architectures for 2050

  • Deliverables

    D4.3 Data sets of scenarios and intermediate grid architectures for 2040

  • Deliverables

    D5_1_Towards a governance model for the European electricity transmission network in 2050

  • Deliverables

    D6.3_Modular plan over 2030-2050 for the European transmission system a complete analysis of costs and benefits

  • Deliverables

    D3.2 Technology innovation needs

  • Deliverables

    D4.2b Testing Aspects of the SESA Methodology to Grid Architectures of Large Scale RES and 100 RES

  • Deliverables

    D4.1 Operational validation of the grid reinforcements by 2050

  • Deliverables

    D4.4 Modular development plan from 2020 to 2050

  • Deliverables

    e-Highway database per country

  • Deliverables

    D3.1 Technology assessment from 2030 to 2050

  • Deliverables

    Impacts of ICT on the pan-European Power System up to the 2050 Time Horizon

  • Deliverables

    Note on power to gas

  • Deliverables

    Report AC OHL

  • Deliverables

    Report Batteries

  • Deliverables

    Report Cables

  • Deliverables

    Report CAES

  • Deliverables

    Report CHP

  • Deliverables

    Report demand technologies selection a

  • Deliverables

    Report demand technologies selection b

  • Deliverables

    Report electric vehicles

  • Deliverables

    Report FACTS

  • Deliverables

    Report Generation

  • Deliverables

    Report Heat Pumps

  • Deliverables

    Report HVDC

  • Deliverables

    Report LED and lighting

  • Deliverables

    Report OHL HVDC

  • Deliverables

    Report protection and control

  • Deliverables

    Report transformers AC breakers

  • Deliverables

    Report wind power

  • Deliverables

    e-Highway2050 Toolbox

  • Deliverables

    e-Highway2050 2050 Country and cluster installed capacities

  • Deliverables

    D8_5b: Prototype to assess robustness of a grid architecture

  • Deliverables

    D8_5a: Enhanced methodology to assess robustness of a grid architecture

  • Deliverables

    D8.4.b: Prototype for optimal modular plan to reach 2050 grid architectures

  • Deliverables

    D8.4.a: Enhanced methodology to define the optimal modular plan

  • Deliverables

    D8.3.b: Prototype for the definition of optimal grid architectures for 2050

  • Deliverables

    D8.3.a: Enhanced methodology to define optimal grid architectures for 2050

  • Deliverables

    D8.2.b: Demand Generation scenarios prototype

  • Deliverables

    D8.2.a: Enhanced methodology for the computation of Demand Generation scenarios

  • Deliverables

    D6 2: A Toolbox supporting a pan-European technical evaluation of costs and benefits

  • Deliverables

    D2_2: European cluster model of the Pan-European transmission grid 20072015

  • Deliverables

    D2_1: Data sets of scenarios for 2050 20072015

  • Deliverables

    D 2.3: System simulations analysis and overlay grid development

  • Deliverables

    D 2.3: System simulations analysis and overlay grid development digest

  • Deliverables

    A comprehensive long term benefit cost assessment for analyzing pan-European transmission highways deployment (by WP6)

    This document is the deliverable D6.1 of the e-Highway2050 project. It has been developed by WP6 (Socio economic profitability) and contains a comprehensive long term benefit cost assessment for analyzing pan-European transmission highways deployment.

    Download PDF

  • Deliverables

    European cluster model of the Pan-European transmission grid (by WP2)

    This document is the deliverable D2.2 of the e-Highway2050 project. It has been developed by WP2 (Developing the Grid architecture options as a function of the retained scenarios) and contains a European cluster model of the Pan-European transmission grid.

    Download PDF

  • Deliverables

    Methodology for environmental and sustainability assessment and results of its application to the assessment of strategic options (by WP4)

    This document is the deliverable D4.2a of the e-Highway2050 project. It has been developed by WP4 (Modular development & operations) and contains a Methodology for environmental and sustainability assessment and results of its application to the assessment of strategic options.

    Download Link

  • Deliverables

    High-level definition of a new methodology for long-term grid planning (by WP 8)

    This document is the deliverable D8.10 of the e-Highway2050 project. It contains the high-level description of the new methodology for long-term grid planning that will be developed by Work Package 8.

    Download PDF

  • Deliverables

    Structuring of uncertainties, options and boundary conditions for the implementation of EHS (by WP 1)

    The main purpose of Deliverable D1.2 as final deliverable of Work Package 1 of e-Highway2050 is to summarize the main findings from the different tasks in the work package and present recommendations for the following work in e-Highway2050. This document structures uncertainties/futures, options/strategies and corresponding boundary conditions for the implementation of EHS that were identified in the different tasks of WP1, in particular technological, economical, political, socio- political and environmental uncertainties and options. The reports from the different WP1 Milestones are confidential but can be accessible upon request to the Coordinator.


    Download PDF

  • Deliverables

    Executive Summary "Setting the Boundary Conditions for 2020 -2050 Grid Planning" (by WP 1)

    Work package 1 (WP1) of the e-Highway2050 project establishes a comprehensive set of Boundary Conditions to inform all participants of the opportunities and limitations that are required to bring about a successful transition from today's solutions to the next generation of infrastructure needed to support an integrated power system with electricity generation driven predominantly by renewable energy sources in 2050.

    Download PDF

  • Deliverables

    Review of useful studies, policies and codes (by WP 1)

    The objective of this document as the first of two deliverables from WP1 is to collect current knowledge and expectations about future developments in Europe, as seen from the TSO side and in other relevant scenario studies. Together with the outputs from the other tasks this report will be a supplement to the final deliverable D1.2 of WP1.

    Download PDF